Chicago Public Library

   

 Español | Polski | 


 
add to favorites : reference url back to results : previous : next
Zoom in Zoom out Pan left Pan right Pan up Pan down Maximum resolution Fit in window Fit to width Rotate left Rotate right Hide/show thumbnail
BP Bridge, pile-driving rig, May 9, 2003
BP Bridge, pile-driving rig, May 9, 2003
TitleBP Bridge, pile-driving rig, May 9, 2003
DescriptionMachinery used to drill micropiles into place to support the BP Bridge from the garage below. The micropiles support the central pier on the median strip of Columbus Drive and extend through the garage to the bed rock below.
NeighborhoodLoop (Chicago, Ill.)
Subject.TGMGarages
Ladders
Pile drivers
Subject.LCSHBP Bridge (Chicago, Ill.) -- Design and construction
PhotographerUnknown
ArtistsGehry, Frank O., 1929-
ContributorsCourtesy of U.S. Equities Realty and the men and women who built Millennium Park
Date Of Download5/9/2003
Time Period2000; 2001; 2002; 2003; 2004; 2005; 2006; 2007; 2008; 2009
Repository NumberSPE-MP USER BP Bridge 2003.5.9.13
Repository NameChicago Public Library Special Collections and Preservation Division
CollectionMillennium Park, U.S. Equities Realty Collection
Rightshttp://www.chipublib.org/aboutcpl/cplpolicies/policies/photo_reproduct.php
Languageeng
TypeImage
Original Formatjpeg
Original Size1.28 MB
Original Resolution (dpi)72
Original Dimension (Pixels)2048x1536
Camera SpecificationsSony CD MAVICA
BookBP Bridge
ChapterChapter 2: Excavating and landscaping
add to favorites : reference url back to results : previous : next