Chicago Public Library

   

 Español | Polski | 


 
Browsing 5148 item(s) in
results 281-300 of 5148 item(s)  page 15 of 258 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next
select all : clear all : add to favorites
 Image: Title: Subject.TGM: Description:

281. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Tents; A glass brick panel mock-up, with an LED screen behind, at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for the tower...

282. Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Crown Fountain, testing in Melbourne, Florida, May 19, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Tents; A glass brick panel mock-up, with an LED screen behind, at the headquarters of Circle Redmont Inc. in Melbourne, Florida. The mock-up was created to test a possible steel support structure for the tower...

283. Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Crown Fountain, testing in Melbourne, Florida, May 20, 2003 Industrial facilities; Glass blocks; Structural frames; Mock-ups; Lighting; Trees; Tents; A glass brick panel mock-up, with an LED screen behind, outside the Circle Redmont Inc. headquarters in Melbourne, Florida.

284. Crown Fountain, glass brick wall, tower interior, July 23, 2004 Crown Fountain, glass brick wall, tower interior, July 23, 2004 Glass blocks; Structural frames; Structural systems; A glass brick wall of one of the towers, seen from the interior.

285. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Glass industry; Industrial facilities; Glassworking; Glassworkers; A glass worker at the L.E. Smith Glass Company in Mt. Pleasant, Pennsylvania, the company that made over 22,000 glass bricks for the Crown Fountain. At the height of production L.E. Smith was able to make...

286. Crown Fountain, LED screen test in green and red, south tower, June 21, 2004 Crown Fountain, LED screen test in green and red, south tower, June 21, 2004 Glass blocks; Structural frames; Lighting; Testing; Reflections; A green and red test pattern lights up the south tower at night. The north tower is visible at right.

287. Crown Fountain, LED screen test in green, north tower, June 21, 2004 Crown Fountain, LED screen test in green, north tower, June 21, 2004 Lighting; Testing; Reflections; A green test pattern lights up the north tower at night. In the background, the diamond-shaped roof of the Smurfit-Stone Building is outlined in lights.

288. Crown Fountain, installing glass brick panels, April 5, 2004 Crown Fountain, installing glass brick panels, April 5, 2004 Glass blocks; Structural frames; Hoisting machinery; Construction workers; Pipes (Conduits); A grid of glass bricks is lifted and hoisted into place on the north tower of Crown Fountain. LED panels are already in place on the tower and a gap shows where the “gargoyle” nozzle will be fitted....

289. Jay Pritzker Pavilion, hallway, May 29, 2003 Jay Pritzker Pavilion, hallway, May 29, 2003 Passageways; Ladders; Construction equipment; A hallway backstage during construction.

290. Jay Pritzker Pavilion, hallway, October 15, 2002 Jay Pritzker Pavilion, hallway, October 15, 2002 Passageways; A hallway backstage during construction.

291. Jay Pritzker Pavilion, hallway, January 9, 2003 Jay Pritzker Pavilion, hallway, January 9, 2003 Passageways; A hallway backstage during construction.

292. Jay Pritzker Pavilion, hallway, April 24, 2003 Jay Pritzker Pavilion, hallway, April 24, 2003 Passageways; A hallway backstage during construction.

293. Jay Pritzker Pavilion, hallway, February 6, 2003 Jay Pritzker Pavilion, hallway, February 6, 2003 Passageways; Boxes; A hallway backstage during construction.

294. Jay Pritzker Pavilion, hallway, April 24, 2003 Jay Pritzker Pavilion, hallway, April 24, 2003 Construction workers; Passageways; Brooms & Brushes; A hallway backstage during construction.

295. Jay Pritzker Pavilion, hallway, May 29, 2003 Jay Pritzker Pavilion, hallway, May 29, 2003 Passageways; A hallway backstage during construction.

296. Jay Pritzker Pavilion, interior view, January 9, 2003 Jay Pritzker Pavilion, interior view, January 9, 2003 Passageways; Ladders; Dollies (Moving equipment); Boxes; Pipes (Conduits); A hallway backstage during construction.

297. Cloud Gate, attaching steel plates, May 27, 2004 Cloud Gate, attaching steel plates, May 27, 2004 Steel; Structural systems; Stickers; Cans; A hard hat at SBC Plaza.

298. BP Bridge, filling in Daley Bicentennial Plaza, November 12, 2003 BP Bridge, filling in Daley Bicentennial Plaza, November 12, 2003 Structural frames; Dirt; Skyscrapers; A heap of soil is ready to be spread out over the parts of Daley Bicentennial Plaza that were excavated during the BP Bridge's construction. The Bridge's concrete foundation ramp, with subframing for the...

299. BP Bridge, filling in Daley Bicentennial Plaza, November 12, 2003 BP Bridge, filling in Daley Bicentennial Plaza, November 12, 2003 Structural frames; Skyscrapers; Dirt; A heap of soil is ready to be spread out over the parts of Daley Bicentennial Plaza that were excavated during the BP Bridge's construction. The Bridge's concrete foundation ramp, with subframing for the...

300. Crown Fountain, fabricating the glass bricks, May 21, 2003 Crown Fountain, fabricating the glass bricks, May 21, 2003 Kilns; Glass industry; Industrial facilities; Ladders; A kiln at the L.E. Smith Glass Company in Mount Pleasant, Pennsylvania. L.E. Smith Glass Company fabricated 22,000 five- by ten- by two-inch glass bricks for the towers of Crown Fountain.
select all : clear all : add to favorites
results 281-300 of 5148 item(s)  page 15 of 258 : ( <<  11  12  13  14  15  16  17  18  19  20  >> ) :: previous : next